Description:
A brand-new Aubrey 28 on titled land in The Avenues at Stockland's Aura.
The land is already titled, so there's no waiting on registration. Once finance and plans are approved, the build can get started.
Lot 5100 is a big 618m² block with an 18m frontage in The Avenues, Nirimba.
The Aubrey 28 is a 269m² single-level family home. You come in past a wrap-around porch, with the media room just off the entry. The kids' end has three bedrooms, a main bathroom, a powder room and a tech bench for homework. The main bedroom is at the back of the house with a walk-in robe and ensuite. The kitchen has a butler's pantry and walk-in pantry behind it, and opens to the living and dining area and out to a full-width alfresco. Double garage.
The price is set up for The Avenues. It already includes the Urban parapet facade The Avenues' roof rules call for, the Sunshine Coast building loading, the 5,000L rainwater tank and the EV charger circuit the estate requires, and the Aubrey's wrap-around porch meets the estate's porch rule.
It's built in Ultra's Inspire range, so the everyday things are already in the price: a 7kW split system, stone benchtops, blockout blinds, heat pump hot water, an exposed aggregate driveway, a remote garage door and council and QBCC fees.
Supersize Your Home: pay your deposit by 31 October 2026 and Ultra adds $15,000 of upgrades to eligible single-storey Inspire homes like this one. That's 2590mm ceilings, a 1200mm wide front door and 900mm Artusi appliances. Conditions apply.
Why this one: a 269m² home with a butler's pantry and media room on a big titled block in Aura.
A quick note on the photos: the facade image is Ultra's Urban facade style (included in the price), and the other images are of other Ultra homes, not this house on this lot. Your home will be built to the Aubrey 28 floor plan, with the facade, colours and finishes you select.
Call or message Andrew Nix on 0498 800 312 or
[email protected] for the floor plan and siting.
Price is land + build on Ultra's October price list, for contracts signed by 28 December 2026, including the Urban facade, Sunshine Coast loading, a 5,000L tank and an EV circuit. Subject to land availability, site investigations, developer requirements, selections and final pricing. The Avenues requires a light roof colour and front landscaping, fencing, a letterbox and a clothesline within 6 weeks of handover; these are not included.